Had a 4" thick concrete drive poured over a 4"-6" compacted gravel base. Contractor told me to wait seven days before using driveway again. Temps have been averaging upper 30's for lows, low 60's for highs. Very little rain, but I have "watered" the drive twice a day, each day as instructed to help with the curing. Tomorrow is the big day. Is seven days long enough? All of my neighbors are from up North and think it's way too early. Just want another opinion...
Thanks.