We moved into our new home on Nov.1 97. The basement is an 8" poured in place structure. The below grade exterior of the basement was spray coated with a green rubber based product that supposedly is water tight. We have not seen any evidence of moisture other than a light dampness which I 've attributted to the concrete curing. I want to start finishing the basement. I have the following questions: 1. Is it to soon to begin working with the concrete 2. Should I coat the inside walls and floor with a sealer 3. When I frame can I lay my studs flat to the wall ( 1 1/2" cavity )and use Dow 1" against the wall between the studs. 4. How best do I secure the frame to the floor and the walls . Do I use cement molly bolts? 5. How can I insulate the floor? 6. Should I use a moisture barrier?