Have recently added on to a small house. Exsisting service is 60 amp. Rather than run a sub panel I would to change panel box to a 100 or 200 amp service. Do I need the hydro company to upgrade their wiring to the stack and meter or can I simply replace the service panel after having them disconnect the power.