Moderator Post (s) for this thread: >drain backfillbytomh on 08/04/2004
The volume is about the same as 1 inch of your trench depth.
Since you wanted 2 inches on top for topsoil, tomh did the right thing by specifying 10 inches and allowing 1 inch for settling of the rock.
Good Luck!
Dodgeman