I personally find that attaching the beams to the sides of the post and then cutting the post off even with the beams is a much easier and better way.
You can predrill the holes and sink a 4 inch lag bolt through the 2x's and into the 4 x.
Steve
Topic History:
Topic Follow-ups:
About | Press Room | FAQ | Contact | Sitemap | Privacy Policy | Terms of Use | Help
© 2009 BobVila.com