 |
should be fairly easy to do this,,, Posted by itsreallyconcrete on November 20th, 2008 06:25 AM In reply to Basement flooring by Unregistered-erickpay on November 18th, 2008 02:38 PM [Go to top of thread]
but that means its extremely labor intensive, of course,,, first, do a moisture test to be sure your floor's a good candidate for what you propose,,, if so, prep the floor to receive a new self-leveling overlayment,,, then find your floor's high point & reference it about the room,,, use styrofoam blockout & duct tape to cover drain,,, transfer elevation to blockout,,, install the floor leveler,,, remove blockout & reinstall drain cover,,, sound easy enough ?
Yes Its Concrete
decorative conc artisans
stain-emboss-sculpt-engrave
concrete repairs
Was this post helpful? Yes: or No:
|
 |