I have to maintenance my master bathroome shower and make water damage repairs. Tiles have actually collapsed into the shower and the drywall crumbled. I figured that should be the first project to attack. What is the first step I should take in removing my tile. As a result of the water damage, carpet, flooring, and baseboards will have to be replaced. I have never attempted to do anything like this before and who like to get a good check list of things to do, tips on things to be aware, and a priority list of what should be done first and why. Thanks