I am currently preparing to patch a hole I
made in my basement wall to run a water line to
an outside faucet. I bought a 50lb bag of the
"Red," quick drying, quickcrete. The bag
instructions do not mention my specific
application, but a similar block building
application suggested 1/2 gallon water for the
50lb bag. Does this sound right?
Thanks