i own land that is land locked on all four sides, have a deeded easement that is approx,. 1900 ft long. the easement is 30 ft wide and mostly georgia red clay . i've laid over 300 tons of crush and run on it to make it suitable for passage during wet weather. the last 800 ft of easement is a downhill slope of appro 22 to 28 degrees. my question is do i just keep pouring crush and run or is their a better way to keep the road firm for wet weather travel
thanks