I want to build a sub-floor in my basement and was wondering if I could lay Schedule 40 PVC as a grid. And then lay the floor on that. Then could I pump hot air through the PVC for heat.
Topic History:
About | Press Room | FAQ | Contact | Sitemap | Privacy Policy | Terms of Use | Help
© 2009 BobVila.com