Drywall Installation

Project: Vermont Farmhouse, Episode 6, Part 1



Bob tours the interior, looking at the finished drywall and insulation. In the living room, a new Shaw pre-finished hardwood floor is being put down. David LaFosse (from LaFosse & Co.) is on hand to talk to Bob about the process. In the kitchen Ryley and Pat Cloutier are busy putting up trim around the windows.
Part 1: Drywall Installation
Bob walks through the farmhouse interior, now that the drywall is complete, and points out some of the challenges the home's design posed for the drywall contractors.

In a flashback, we watch the drywall job in progress. The contractors begin with the most difficult element, where the valley of the roof is virtually built into the room, then finish up with large pieces of drywall on the ceiling and walls.
Part 2: Hard Maple Flooring Installation
Part 3: Trimming Out Double-Hung Windows
The wooded New England setting, with quaint towns and covered bridges, provides the perfect backdrop for building a traditional Vermont-style farmhouse.

Bob works with the Quechee Lakes Development Company to build a residence that hearkens back to the past yet satisfies the needs of a family in the new millennium.