- Bob Vila TV Shows >
- Ranch Expansion > Episode 20: Pouring Cement and Installing Crown Molding
Playground Construction, Part 2
Project: Ranch Expansion, Episode 20, Part 3
Bob learns how to pour a cement walk, which looks as if it's composed of granite slabs. While contractor Bob Ryley is installing crown molding in the den, Bob visits Anderson McQuaid Hardwoods to see where the molding was milled. Plus, Bob returns to Columbus, OH, where the playground project is well underway.
- Part 1: Constructing the Concrete Walkway
- Part 2: Custom Crown Molding
- Part 3: Playground Construction, Part 2
- In Columbus, OH, Bob and other volunteers are constructing a playground. Bob discusss the materials and techniques used in the project, including the octagonal roofs and "wavy" walkways.
Bob takes on the expansion of a 35 year-old ranch house in Wayland, MA. With an eye on the budget, projects include European kitchen cabinets, a state-of-the-art closet system for the master bedroom, custom built-in bookshelves, an eye-catching fan detail on the front façade, and a private deck off the master bedroom.
ALL EPISODES IN RANCH EXPANSION