Privacy Glass Installation

Project: Waterfront Warehouse Rehab, Episode 7, Part 2



On the roof, Bob and Chris Vila discuss the cooling units with HVAC contractor Isaac Chazbani. At the same time, welder Jimmy Canka installing an iron safety railing and glazier Alan Chi installs glass windows and doors in the roof deck entryway.

Next, Bob and John Sodano, the plumbing contractor, discuss the placement of the boiler. Bob then goes indoors to review installation of the Bellawood hardwood flooring with Stephen Shelowitz (Williamsburg Parquet Flooring). Shelowitz explains the finer points of Bellawood's flooring product. He details how the factory-applied finish is tested and how his crew installs the flooring.
Part 1: Safety Railing Installation
Part 2: Privacy Glass Installation
Bob meets with window installer Alan Chi of Finest Windows. Mr. Chi is installing the glass walls for the head house (the head house is the structure surrounding the stairs that lead up from the penthouse). Frosted thermal glass panels are being used for privacy, as the taller buildings surrounding the location can look down on the deck. The custom glass snaps into place, along with a rubber gasket, and silicone caulk in the corners prevents moisture from entering the enclosure. With the glass in place, a door rated for industrial use is installed.
Part 3: Installing Hardwood Flooring

MOST POPULAR CLIPS

OUTDOOR PROJECTS

HOUSE & GARDEN TOURS