Plans for the Multi-Level Backyard Deck
The extensive new deck will have multiple levels and various sections. General contractor Tim Berky digs holes for the footings before setting them in concrete.
The extensive new deck will have multiple levels and various sections. General contractor Tim Berky digs holes for the footings before setting them in concrete.
General contractor Tim Berky installs the white oak, tongue-and-groove floor. Since the flooring will be nailed over the hyrdronic heat system, it is critical to avoid puncturing any tubes. Berky installs the flooring perpendicular to the tubing, so he can always see the tubes and avoid nailing into them.
John Martin (from WarmZone) is on-hand to show Bob how the medium density fiberboard (MDF) faced with reflective aluminum shielding, and precut channels for the hot-water tubing, comes together to create a layout for the in-floor radiant heat system.