Discussing the Home Spa and Replacing the Finial on the Turret
The spa is installed in the third-floor exercise room and the finial section is put on the turret roof.
The spa is installed in the third-floor exercise room and the finial section is put on the turret roof.
The air conditioning system for the third floor exercise area, with its unique features and ductwork, is installed.
A new kind of rubber slate is applied to the roof, and the crew brings the spa down on a special plywood ramp, then carefully places it in the turret for installation.
Homeowner Don DeSantis is transforming the attic level into an exercise space. The floor structure is being shored up in order to hold the wieght of excercise equipment and a hot tub.