Exterior Prep and Painting
Bob discusses painting the exterior of the Victorian project house, which needed prep work before painting.
Bob discusses painting the exterior of the Victorian project house, which needed prep work before painting.
Bob watches as gutters are installed along the copper-roofed breezeway.
Bob Fulmer (from Harraseeket Restoration, Inc.) joins Bob on the roof of the breezeway to install a double-lock standing seam copper roof.
Bob goes up to the attic of the Victorian project house, where an ODL tubular skylight is being installed. Also, Bob looks back at the installation of windows on the gable end.
Bob talks with general contractor Charlie Tomaszewski, who’s recreating decorative trim and replacing, or removing, old shingles.
Barry Driscoll (from Driscoll Electric) is installing some new Lightolier recessed fixtures specially designed for use in remodels.
A representative from Owens Corning tells Bob about the architectural shingles that have been selected to replace the old roofing material. And Velux VSE skylights with copper step flashing are installed.
Bob discusses the SpacePak HVAC system that’s being installed to provide heating and cooling in the house and barn. The SpacePak system is well-suited to projects where space for ductwork is at a premium.
Bob talks with Ray Adam (from Pella Windows) about the new French doors to be installed in the library. It’s an active/inactive door with all hardware. The most important part of the installation is ensuring the door is plumb.
Much of the space on the first floor has been opened up to give the house a 21st-century lifestyle feel. The framing of the new addition is ongoing, and the Kohler bathtub is being installed.