Latest Discussions : Miscellaneous

bubblepuppy

04:51PM | 02/02/02
Member Since: 01/20/02
10 lifetime posts
I will be pouring a 15' diameter concrete pad for a gazebo. The ready mix truck cannot get any closer that 30' from the forms. What is the best way to get the crete from point "A" to point "B"? The gazebo site is down a moderate slope from where the truck will be, and the slope is very irregular. I would like to hear from anyone with "Georgia Buggy " experience, to see if that may be my solution. Any other suggestions are appreciated.
thanks


Post a reply as Anonymous

Photo must be in JPG, GIF or PNG format and less than 5MB.

Reply choose button

Anonymous

Post new button or Login button
Register