We added a bathroom on ourselves, and now need to tile the floor. Do the backer board and tile go down before the toilet flange? Or the backer board first, then flange - then tile meets flange? Any help here is appreciated :-)

Billhart

07:51PM | 11/06/06
Member Since: 04/25/05
1915 lifetime posts
Ideally the bottom of the flange will set directly on top of the finished floor.

So when possible wait until the tile is down and then cut the pipe and install the flange.