Flooring, Plumbing, and Plastering

The old flooring in the Gothic Carpenter-style home in Elmwood has been removed. Bob outlines the process of installing the new floor and discusses the new support beams with the carpenters. Meanwhile, plumbing and plaster work get underway.

Clip Summary

The old flooring in the Gothic Carpenter-style home in Elmwood has been removed. "Sleepers" are placed in the subfloor to level the surface. Next, some Georgia Pacific "Sturdy Floor" is laid down.

Carpenters Neal Cummings and Al Kaplan are installing LVL (Laminated Veneer Lumber) beams, which are 50% sturdier than conventional lumber.

Chis Stewart (from Gem Plumbing) talks with Bob in the basement about the removal of stack pipes and insertion of PVC.

On the main floor, the framing is complete, leaving the area open for the kitchen remodel. The plaster team from Kent Plastering comes in to install the blue board and cover the joints with mesh tape.