More /Video /Malibu Beach House /Framing and Insulation Framing and Erecting the Second-Floor Walls The second-floor walls are framed and erected at the Malibu beach house. Clip Summary The second-floor walls are framed and erected at the Malibu beach house. Your browser does not support the video tag. Clips in More Excavation and Foundation Work Tour of the Victorian Interior Reviewing Plans for Updating the Victorian Demolition and Reconstruction of Victorian Foundation Clips in Framing and Insulation Hip Roof Framing Cellulose Insulation Installation Share Design DIY Exterior Interior Lawn & Garden More Real Estate Reviews Clips in More Installing High-Performance French Doors Removing Horsehair Plaster and Door Framing Matching Original Victorian Frieze Board Spraying In Closed-Cell Insulation Clips in Malibu Beach House Malibu Beachfront Property Touring Los Angeles Real Estate Helicopter Tour of Los Angeles Malibu Master Bedroom Tour