Tour of the Completed Workout Area
Bob takes a final tour of the home workout area, discussing the tub surround and the new exercise equipment.
Bob takes a final tour of the home workout area, discussing the tub surround and the new exercise equipment.
Bob recaps the entire Elmwood project. It was a community effort involving an array of houses, though great pains were made to adhere to the historic look of the area. Bob commends the contractors and owners alike for jobs well done.
A granite tub surround is installed, as well as an in-floor heating system and unique fiber optic lighting.
The turret has been reframed and the floor is prepared to receive the spa tub.
The spa is installed in the third-floor exercise room and the finial section is put on the turret roof.
The air conditioning system for the third floor exercise area, with its unique features and ductwork, is installed.
A new kind of rubber slate is applied to the roof, and the crew brings the spa down on a special plywood ramp, then carefully places it in the turret for installation.
Homeowner Don DeSantis is transforming the attic level into an exercise space. The floor structure is being shored up in order to hold the wieght of excercise equipment and a hot tub.
Bob takes a final tour of this unique third floor remodel and talks to the owners about their eclectic taste.
Cabinetry and countertops are brought in for this attic conversion project, and fiber-optic lighting is installed.