Latest Discussions : Buying & Selling Homes

sudipk123

02:10PM | 12/20/04
Member Since: 12/13/04
5 lifetime posts
I am closing on a new home on 29th and having a walkthrough on 27th of this month. However as per builder they have not received electrical meter and they are not sure of when they have it.

Firstly I think probably walkthrough should be delayed until electrical meter is present? Is that a right assumption

Due to this I also cannot also schedule an inspection date. (with private home inspector) . Does the builder have to depend on the county or utility company for the meters? (and thus cannot give me a date) .

joed

06:44AM | 02/21/05
Member Since: 09/17/02
524 lifetime posts
After the proper electrical inspection the local power company comes and installs the meter. Neither the electrician or the contrator install meters.


Post a reply as Anonymous

Photo must be in JPG, GIF or PNG format and less than 5MB.

Reply choose button

Anonymous

Post new button or Login button
Register