Latest Discussions : Miscellaneous

Tphillips

05:27PM | 05/05/99
I built a 12x24 shop, but the slab set up before it could be properly floated. The floor is rough and a little uneven. Can I do anything to fix it?

poll3975

06:04AM | 05/12/99
I posted a similar question in a couple different places. The reply I got was to get a portable planer and walk it around the floor, clean it all thoroughly, install a self-leveling product (in this case he suggested a gypsum based ardex product with fibre mixed in to make it stronger).

The alternative that was offered to me was to install a subfloor.

He said the treatment with the planer and the self leveling product takes 2-3 days to do in an average basement.

Hope this helps. If you would like to see my original post its a couple entries down from yours on the bulletin board.

Chris



Post a reply as Anonymous

Photo must be in JPG, GIF or PNG format and less than 5MB.

Reply choose button

Anonymous

Post new button or Login button
Register