I have layed and mortared 1/3 of the floor that I am working on. Since this is a weekend project for me,it will be several weeks before the entire floor is layed and mortared. Is it ok for me to wait until I can grout the whole floor, or should I grout each section that I complete as I go?

P.S. Thanks again for your help with the layout. I straddled the center line as you suggested and now have a 9" tile on either end. (Much better than the 2.5" that I started with!)

Tileguybob

04:32PM | 07/31/05
Member Since: 07/03/05
281 lifetime posts
You can wait but be careful about rolling anything heavy over the ungrouted joints. Maybe a throw rug over the heavy traffic areas. Then vacuum out the joints real good before you grout.

Glad to hear the layout looks good


Post a reply as Anonymous

Photo must be in JPG, GIF or PNG format and less than 5MB.

Reply_choose_button

captcha
type the code from the image

Anonymous

Post_new_button or Login_button
Register

Follow Us

horizontal divider
facebook
 
webapp2